RBT100LFP12S

Renogy 100Ah Smart LiFePO4 wiring diagram

Original Smart 12.8V 100Ah LiFePO4 with internal BMS and RS485 ports. Bluetooth requires an external module; parallel connection only, with no self-heating specified.

Nominal voltage
12.8 V
Capacity
100 Ah
Maximum discharge
100 A

Wiring diagram

How the Smart 100Ah LFP is wired.

Open this example in Crimp to use your own parts and cable lengths. Review the assumptions and installation notes as you adapt the circuit.

Renogy 100Ah Smart LiFePO4 wiring example with 4 components: Smart 100Ah LFP, Battery disconnect, Fused DC distribution, DC fridge. 5 cable connections. Crossings are not junctions.Fused DC distribution 1 to DC fridge +: 4 mm² · 15 A fuse, 3 m one way. Fused DC distribution 1 to DC fridge −: 4 mm², 3 m one way. Smart 100Ah LFP + to Battery disconnect A: 4 mm² · 15 A fuse, 3 m one way. Battery disconnect B to Fused DC distribution IN +: 4 mm² · 15 A fuse, 3 m one way. Smart 100Ah LFP − to Fused DC distribution IN −: 4 mm², 3 m one wayFused DC distribution 1 to DC fridge +: 4 mm² · 15 A fuse, 3 m one wayFused DC distribution 1 to DC fridge −: 4 mm², 3 m one waySmart 100Ah LFP + to Battery disconnect A: 4 mm² · 15 A fuse, 3 m one wayBattery disconnect B to Fused DC distribution IN +: 4 mm² · 15 A fuse, 3 m one waySmart 100Ah LFP − to Fused DC distribution IN −: 4 mm², 3 m one wayRenogy 100Ah Smart LiFePO4Smart 100Ah LFP++−−Main Battery SwitchBattery disconnectABBlue Sea 5025 ST Blade Fuse BlockFused DC distributionIN +IN +IN −IN −1111Dometic CRX-65 Fridge. This 12 V example uses Dometic's 15 A supply protection and a short 1 m run with 6 mm² cable. Check the manual's voltage-specific cable graph for your route. At 24 V, the specified protection is 7.5 A. Running current and the fuse rating describe different things.DC fridge++−−4 mm² · 15 A fuse4 mm²4 mm² · 15 A fuse4 mm² · 15 A fuse
Renogy 100Ah Smart LiFePO4 wiring example with 4 components: Smart 100Ah LFP, Battery disconnect, Fused DC distribution, DC fridge. 5 cable connections. Crossings are not junctions.Red = positive · dark = return · dashed = signal. Wire sizes and fuse ratings are example values; use the equipment instructions and actual installation lengths.
Edit this wiring example

Cable sizing for this example

Use the diagram as a starting point for your installation. Replace the example equipment and cable lengths with your own, and check the connections against your exact model's instructions.

Cable sizes depend on the connected equipment, current and cable lengths. Add those details in Crimp to size each run.

View diagram in AWG

Installation notes

Before you install.

Open a question for model-specific guidance and sources.

Verified against the manufacturer's documentation (rev. 2.1), checked 2026-10-01. Manufacturer documentation →

Match the original Smart battery

This is the RBT100LFP12S Smart 12 V 100 Ah, matching the pictured case with covered RJ45 ports. Renogy's download center identifies that SKU; the former catalog suffix “-BT” was not a supported model identifier. This generation uses an external Renogy Bluetooth module for phone monitoring. The self-heating RBT100LFP12SH and newer Pro batteries have different instructions. See Renogy's manual directory and Smart manual, printed page 8.

Connect power and monitoring separately

The power terminals use M8 × 1 × 15 mm bolts, with 7–8 Nm recommended torque. Put lugs against the terminal and washers above them; check that bolts clamp the lug without bottoming out. Keep the battery dry, cool and ventilated. Size external cables and protection for the actual circuit. The published maxima are 50 A continuous charging and 100 A continuous discharge; Crimp's larger terminal planning allowance does not increase them. See specifications, printed page 17.

The RJ45 sockets carry RS485, not network Ethernet. For a communicating bank, link each battery's LINK socket to the next battery's UP socket using the specified straight-through CAT5-or-better lead. Attach the monitoring accessory to the first battery's UP socket.

Keep this model out of series banks

Renogy prohibits series connection. Parallel only matching chemistry, model, voltage and capacity, with equal-length interconnects and opposite-end system takeoffs. Avoid large voltage differences before joining batteries. The manual recommends no more than four parallel batteries when using auto-balancing; it does not justify a larger bank merely because the connector can accept another lead.

Activate and charge correctly

Keep the battery in shelf mode during installation. After checking connections, activate it with charging or the activation switch on the UP port. Use a LiFePO4 charger at 14.4 V, staying below 50 A. The standard charging example uses 20 A and tapers to 2 A; that example is not the maximum rating. Charging requires 0–55°C and discharge −20–60°C. This manual does not establish self-heating. See operation, printed pages 10–12.

After low-charge shutdown, disconnect loads and recharge promptly. For storage, disconnect the system before using shelf mode; a protective BMS trip does not remove every possible drain.

Technical reference

Specifications and terminal map.

Check the model, ratings and connection points against your own unit before choosing installation hardware.

Catalog specification

Original Smart 12.8V 100Ah LiFePO4 with internal BMS and RS485 ports. Bluetooth requires an external module; parallel connection only, with no self-heating specified.

Nominal voltage
12.8 V
Capacity
100 Ah
Maximum discharge
100 A

Terminal map

Catalog connection points, current direction and planning limits. Check the manufacturer's pinout and connector ratings before installation.

+

positive · bidi

200 A

−

negative · bidi

200 A
Sources and sizing method

Equipment specifications. Model details, ratings and terminal roles come from the catalog. Check your unit’s label and current manufacturer documentation for its exact revision.

Example sizing. Wire sizes and fuse ratings apply to the connected example, not a fixed cable size for this component. Set your actual equipment, current, lengths and installation conditions in Crimp before choosing hardware.

Read how the sizing works

Next step

Plan your installation with Smart 100Ah LFP.

Open this example as a new project, or add this component to your existing diagram. Use your equipment and cable lengths to review the sizing.

Start drawing, sizing and checking without an account. Your drawing saves in this browser. See Pricing for the equipment allowance and the one-time export offer available to you.